Can't see this email? Click here to see this ebulletin online

Ecodan Renewable Heating Technology
Public Sector eBulletin March 2016

Sustainable procurement – Are you compliant?

If you're currently purchasing pre-formed boiler casings or pipe boxing and it's not from Encasement, then it's not FSC® certified, which could impact on your sustainable procurement policy. As we are UK's only manufacturer of pre-formed plywood pipe boxing and casings products that holds a FSC® 'Chain of Custody Certification' from the Forest Stewardship Council, you...

Highway run-off treatment moves streets ahead

The unique filter medium within Stormwater Management’s new D-Rainclean bio-remedial infiltration channel has achieved class-leading performance for the removal of pollutants from contaminated surface water run-off. In independent tests carried out after six years operation in a high trafficked area, the D-Rainclean system was shown to have outperformed the discharge quality...

Levato MONO Porcelain Paver System

High load and impact resistance; extreme wear and scratch resistance; frost and fireproof; colour fast and extremely resistant to staining; resistance to mould and algae growth - these qualities ensure an extremely low maintenance and trouble free flooring solution. Used in conjunction with height adjustable fixed head or self- levelling pedestals or fixed height paver support pads, the Levato Mono system...

Micropro® Protects Mountain Boardwalk

Cuilcagh Mountain Park in County Fermanagh is a "Wetland of International Importance" as designated by the Ramsar Convention as well as being a Special Area of Conservation (SAC), an Area of Special Scientic Interest (ASSI) and a Natura 2000 site. So when the next stage of development for this area was planned, one of the longest wooden boardwalks in the world, it was vital...

Harrow School has IAAF-standard running track

The re-built athletics facilities at Harrow School included an IAAF-standard running track, facilities for long jump, high jump, discus and all the main athletics events, plus a water jump for the steeplechase and an area for the pole vault event - a relatively rare feature in UK school athletics facilities. Hauraton SPORTFIX components installed at the Harrow School sports complex include; drainage channels...

Home | Advertise With Us | Contact Us | Unsubscribe TSP Media

Powered by Specification Online